Factory Acceptance Tests and OEM Checkouts.
Deployment of many brand-new high speed OEM designed machines in four continents.
Machines were designed by OEMs and GPM was engaged by our customers to accept the delivery of the new equipment.
Factory Acceptance Tests and OEM Checkouts.
Deployment of many brand-new high speed OEM designed machines in four continents.
Machines were designed by OEMs and GPM was engaged by our customers to accept the delivery of the new equipment.
Our customer was experiencing low performance and high waste in 3 assets at one of their sites in North America.
GPM deployed in a very short notice two engineers from Process and Electrical disciplines who led the effort if returning the machine performance back to target while covering process resource gaps within the customer’s engineering department.
Relocated and completely renovated four diaper machines from Turkey to Middle east, and from South Africa to Nigeria. These machines were old hybrids that had been locally manufactured.
Our project consisted of designing a complete new process with a safety system that met ISO13849-1 standards, developed completely new software package, and training and development of new operational team which led to a green-field site in Middle East locally supplying their own products.
Deployment of many brand-new high speed diaper machines in four continents. Machines were designed by our customer and software developed by GPM with customer standards.
GPM oversaw installation supervision, full checkout and startup commissioning, integration of all machines with OPTIMA stacker packaging machines, deployed over 25 OEM diaper machines in Asia, Europe and North/South America.
Our team provided turn-key solution for the customers and took care of software development, machine installation, checkout, personnel training, commissioning, and post startup field support.